Current Projects

Coldfoot to Deadhorse Long Haul Fiber Project Segment 4 –MP 175‐242 of the Dalton Hwy ~69.9 Miles.

Successfully installed, and restored landscape to original condition on over 60 miles of 2 separate 1 ¼-inch fiber optic conduit HDPE conduits, and approximately 100 slack or splice hand hold boxes for a new back bone fiber line in remote areas of northern Alaska. The fourth segment of the system will later tie into both […]

Coldfoot to Deadhorse Long Haul Fiber Project Segment 3 MP 245‐300 of the Dalton Hwy ~51.7 Miles.

Successfully installed and restored landscape to original condition on over 40 miles of 2 separate 1 ¼-inch fiber optic conduit HDPE conduits, as well as approximately 75 slack or splice hand hold boxes for a new back bone fiber line in remote areas of northern Alaska. The third segment portion of the system is ongoing […]

UAF AG Farm Septic System Replacement Fairbanks, AK

In 2013 Drennon Construction was contracted to install a new septic system for the University of Alaska Fairbanks, this work consisted of constructing a new septic system serving the UAF Agricultural Farm, and a switchover from the existing and failing city utility system. The system was originally designed to be installed across from the farm buildings complex […]

Galena Flood Home Raising and Moving

In the spring of 2014 DCC was contracted to raise, move, and provide permanent helical piling’s, on some 41 homes flood damaged and below the newly established 100 year flood plain of 136.5 feet to sill. To date DCC has performed complete work on 31 of the 41 homes, and is scheduled to complete the remaining in the spring […]

2014 FEMA Galena Construction Support

In the spring of 2014 Drennon Construction was contracted by FEMA to help support the rebuilding efforts in Galena, Alaska. Working to support the volunteer efforts to build new homes where the Yukon river had swept the residence old homes away during the spring 2013 flooding, DCC cleared, grubbed, and installed new pads, driveways, and […]

Recent Projects

Tanana Lakes Wetlands Restoration Fairbanks, AK

Port Alexander Boardwalk Project

DNR Toilet Replacement Project Kenai and Fairbanks

Tenderfoot Creek Campground Refurbishment

Government Peaks Alpine Ski Trails Mat Su Borough

Alaganik Slough Boat Ramp Replacement Cordova, AK

 

Tangle Lakes Campground Refurbishment Paxson, AK

        

Past Projects Archive

DNR Richardson Highway Roadside Approaches

Bowers Investments Emergency Septic System Replacement

Harding Lake SRA Expansion and Boat Ramp Replacement

Marx Creek Fish Spawning Channel Project- USDA

GCI Communication Parks Highway Fiber Project

Tangle Lakes Access Road Improvements Paxton, AK

Drennon Construction