• Home
  • Projects
  • Service Options
  • About Us
Fairbanks, Alaska Fairbanks, Alaska
  • Home
  • Projects
  • Service Options
  • About Us

Archives

Monthly Archive for: "March, 2015"
Home /
 Government Peaks Alpine Ski Trails Mat Su Borough
0
By Roy Drennon
In Campgrounds and Trails, Recent Projects
Posted March 31, 2015

Government Peaks Alpine Ski Trails Mat Su Borough

READ MORE
 Alaganik Slough Boat Ramp Replacement Cordova, AK
0
By Roy Drennon
In Boat Ramps and Dewatering, Recent Projects
Posted March 31, 2015

Alaganik Slough Boat Ramp Replacement Cordova, AK

 

READ MORE
 UAF AG Farm Septic System Replacement Fairbanks, AK
0
By drennon
In Current Projects, Water and Sewer
Posted March 26, 2015

UAF AG Farm Septic System Replacement Fairbanks, AK

In 2013 Drennon Construction was contracted to install a new septic system for the University of Alaska Fairbanks, this work consisted of constructing a new septic system serving the UAF [...]

READ MORE
 Tangle Lakes Campground Refurbishment Paxson, AK
0
By drennon
In Recent Projects, Roads and Pads
Posted March 22, 2015

Tangle Lakes Campground Refurbishment Paxson, AK

        

READ MORE
 Galena Flood Home Raising and Moving
0
By drennon
In Current Projects, Home Raising and Moving
Posted March 22, 2015

Galena Flood Home Raising and Moving

In the spring of 2014 DCC was contracted to raise, move, and provide permanent helical piling’s, on some 41 homes flood damaged and below the newly established 100 year flood plain of 136.5 [...]

READ MORE
 2014 FEMA Galena Construction Support
0
By drennon
In Current Projects, Home Raising and Moving
Posted March 22, 2015

2014 FEMA Galena Construction Support

In the spring of 2014 Drennon Construction was contracted by FEMA to help support the rebuilding efforts in Galena, Alaska. Working to support the volunteer efforts to build new homes where the [...]

READ MORE
Have a quick question?
Recent Updates
  • Coldfoot to Deadhorse Long Haul Fiber Project Segment 4 –MP 175‐242 of the Dalton Hwy ~69.9 Miles.
    Coldfoot to Deadhorse Long Haul Fiber Project Segment 4 –MP 175‐242 of the Dalton Hwy ~69.9 Miles.
    March 6, 2017
  • Coldfoot to Deadhorse Long Haul Fiber Project Segment 3 MP 245‐300 of the Dalton Hwy ~51.7 Miles.
    Coldfoot to Deadhorse Long Haul Fiber Project Segment 3 MP 245‐300 of the Dalton Hwy ~51.7 Miles.
    March 6, 2017
  • Employee’s Past and Present
    Employee’s Past and Present
    April 7, 2015
Drennon Construction